The joint efforts of the Pakistan Army and National Highways Authority (NHA) bore fruit and the roads damaged by natural calamities were repaired and opened, reported 24NewsHD TV channel.
The road between upper and lower Chitral was repaired and the connectivity was restored. The repair works on the abutment supporting Mastuj Bridge in Chitral have also been completed. The pillars of the bridge were swept by floods and excessive rains.
The Pakistan Army is striving hard for the restoration of the damaged crossings and roads and the authorities are very hopeful that they will be opened to the public very soon.
The floods and rains in a few days wreaked havoc in the KP province. Rescue operations were launched by the Pak Army to help the victims of calamities.