PTI protest costs Rawalpindi administration dearly
Stay tuned with 24 News HD Android App
The Rawalpindi administration on Monday issued a PTI protest damage assessment report, the 24NewsHD TV channel reported on Monday.
According to the documents available with the 24NewsHD TV channel, GHQ’s gate number one was damaged during the violent protest.
It is estimated that the construction of the gate will cost Rs 0.780 million.
The documents reveal that Rs 0.2 million will be the cost of repairing the main gate of Signals Mess. The broken main gate of the Armed Forces Institute of Cardiology will be required Rs 0.59 million for restoration.
Sixth Road Metro Station, Khatam Nububat Metro Station was burnt and vandalized and Rs 6 million has been estimated for its electrical appliances.
The estimate for civil work damages is underway, the documents added.
Glass and signboard, screen, and doors of Faizabad metro station were destroyed and restoration work is needed an amount of Rs 0.5 million.
Rs 0.6 million is estimated to have repair work for the Hamza Army camp whose windows and glass were broken.
One hundred thousand rupees has been estimated for the restoration of 15 service center building, the documents added.
The windows and cameras of the traffic police office building located in the race course were ransacked which will be required Rs 0.66 million to cover the loss, the document said.